Blog: Case Study

 
Case Study

Seattle Ferry Terminal – Colman Dock

Originally built in 1882 by James Colman, Pier 52 or Colman Dock has been a vital resource along Seattle’s Puget Sound, transporting goods and travelers for centuries. Standing the test of time, the newly constructed ferry terminal breathes new life into imperative infrastructure to elevate the ferry experience. Completed in 2023, the Seattle Ferry Terminal
Read More

Tags: , , ,
Post

A Guiding Light in Thoughtful Hospital Design

Can thoughtful hospital design lead to better patient outcomes? Research says yes. For instance, patients with a view of trees from their bedsides do better than patients with wall views. Patients in well-designed hospital environments “experience less anxiety, require less pain medication and have shorter hospital stays,” according to the Center for Health Design, an
Read More

Tags: ,